Skip to content

ykamoji/airport-delay-analysis

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

149 Commits
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

Website

Visit: Airport Delay Visualization

Presentation

YouTube

Steps for Running

  • Download repository.
  • Open index.html in browser.

All the required libraries are present in the assets folder.

Data

The Bureau of Transportation Statistics (BTS) is a part of the Department of Transportation (DOT) and is the primary source of transportation data for the U.S. government. They collect, analyze, and disseminate data on all modes of transportation. This dataset, known as the “Airline On-Time Performance Data”, encompasses detailed records of scheduled and actual departure and arrival times for non-stop domestic flights reported by certified U.S. air carriers.

Since June 2003, the airlines that report on-time data also report the causes of delays to BTS. This is available in a publicly accessible interface where users can explore various aviation databases, including the "Airline On-Time Performance Data," to retrieve specific datasets. The raw data can be downloaded in excel sheets, with the option to obtain one month of data at a time.

Data source link: https://www.transtats.bts.gov/OT_Delay/OT_DelayCause1.asp

All our relevant data, post-processing results and visualization calculations are shared in the Google Drive Google Drive

About

Airport delay analysis visualization

Resources

Stars

Watchers

Forks

Releases

Packages

Contributors

Languages