Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
11 changes: 11 additions & 0 deletions decisions/northstar/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -136,6 +136,17 @@ registry:
path: ../fairway/.claude/northstar.md
ladders_up_to: l2-ojfbot
posture: active
# fieldwork-1: first field engagement (private repo — dossier + delivery workspace; wayfinder
# decisions/wayfinder/texas-rr-engagement.md, ruled at #345 close 2026-08-01). Engagement-scoped
# + ordinal by design: retires at sustainment/exit; engagement #2 mints l1-fieldwork-2.
# Northstar file lands with the repo bootstrap (#349) — absent-checkout WARN until then.
# NUMERIC CURRENTS/TARGETS ARE PROPOSALS (operator to calibrate).
- slug: l1-fieldwork-1
tier: L1
app: fieldwork-1
path: ../fieldwork-1/.claude/northstar.md
ladders_up_to: l2-ojfbot
posture: active
# Deferred to a later slice (declared here so lint/standup know the intended shape):
# - slug: l2-selfco
# tier: L2
Expand Down
34 changes: 27 additions & 7 deletions decisions/wayfinder/texas-rr-engagement.md
Original file line number Diff line number Diff line change
Expand Up @@ -61,25 +61,45 @@ Pre-map rulings (grilled at charting, recorded here — not closed tickets):

Closed tickets:

(none — charting session)
- Engagement northstar (#345): `l1-fieldwork-1`, engagement-scoped ordinal (repo `fieldwork-1`,
private; retires at sustainment/exit, engagement #2 mints `l1-fieldwork-2`); 5 properties —
arc traversed / value in the customer's numbers / dossier G1–G6 / playbook shadow /
mechanized-auditable delivery; standard movement contract (`Movement proposal:` lines only,
operator-asserted currents); numerics PROPOSED, operator calibrates — Yuri, 2026-08-01
- SE-processes elevation: NASA SEH process model (system design top-down, product realization
bottom-up, technical management cross-cutting) applied recursively to the engagement's
self-built components (P5) — refines, does not reverse, the "no literal ISO-15288 client-facing
framing" ruling; the 17-process mapping detail is widened into the Engagement stage-gates
ticket — Yuri, 2026-08-01 (mid-#345 session)
- Re-anchor ruled: this map re-anchors `l2-ojfbot` → `ns:l1-fieldwork-1` at the repo bootstrap
(#349), when the northstar file exists on disk and the anchor resolves — Yuri, 2026-08-01
- Client-data placement: client-named baselines live in the private engagement repo's northstar
file only; the public registry carries slug/path/anonymous comment; the public map's existing
client intel gets a sanitization pass (new task ticket) — Yuri, 2026-08-01

## Tickets

| Ticket (title, refer-by-name) | Type | Blocked by | Status |
|-------------------------------|------|------------|--------|
| Engagement northstar: naming, properties, movement contract (#345) | grilling | — | open |
| Engagement northstar: naming, properties, movement contract (#345) | grilling | — | closed |
| Discovery instrument for conversation #1 (#346) | grilling | — | open |
| Dossier→presence seam: sanitization gate + permission protocol (#347) | grilling | — | open |
| DFW restoration competitor + segment teardown (#348) | research | — | open |
| Engagement repo bootstrap (private; proof-plan skeleton; fleet-onboard) (#349) | task | Engagement northstar | open |
| Engagement stage-gates + TPM discipline (#350) | grilling | Engagement northstar | open |
| Playbook shadow: format, home, capture points (#351) | grilling | Engagement stage-gates | open |
| Sustainment + exit boundary (#352) | grilling | Engagement stage-gates | open |
| Public-map client-intel sanitization (#356) | task | — | open |

Frontier at charting: Engagement northstar, Discovery instrument, Dossier→presence seam,
Competitor teardown. Recommended first work session: **Engagement northstar** (unblocks two) or
**Discovery instrument** (gates the first real-world conversation).

Frontier after #345 (2026-08-01): Discovery instrument, Dossier→presence seam, Competitor
teardown, Engagement repo bootstrap (unblocked; repo = `fieldwork-1`), Engagement stage-gates
(unblocked; scope WIDENED to include the SEH 17-process mapping onto self-built components),
Public-map client-intel sanitization.

## Not yet specified

- **Generalized pipeline map / customer #2** — statable only after C1/C2 metrics exist; the scale
Expand All @@ -88,13 +108,13 @@ Competitor teardown. Recommended first work session: **Engagement northstar** (u
- **Commercial model beyond the documentation-rights trade** — whether engagement #2 (or a later
phase of #1) is paid, and how that changes the boundary rules. Statable after the first
engagement produces measured value.
- **seh-study / SE-competency tie-in** — whether the engagement doubles as the SE learning
vehicle; deliberately not chosen at charting (fleet machinery ruled in, literal SE framing
ruled out). Revisit only if the operator elevates it.
- **Sub-network + builder-side data access shape** — what data the 100+ subs and the pilot
builder can actually provide; statable after discovery conversation #1.
- **Engagement northstar re-anchor** — once the northstar ticket closes, whether this map
re-anchors from `l2-ojfbot` to the new `l1-*` entry; statable at that close.

Graduated 2026-08-01 (#345 session): *seh-study / SE-competency tie-in* — operator elevated the
NASA SEH process model for self-built components; entered the northstar as P5, detail mapping
widened into the Engagement stage-gates ticket. *Engagement northstar re-anchor* — ruled yes,
executes at the repo bootstrap. Both recorded under Decisions so far.

## Out of scope

Expand Down
Loading