Notifications
You must be signed in to change notification settings - Fork 0
doe pi02
David Sanabria edited this page Aug 6, 2020
·
1 revision
Key Activities: Deploy and Provision for Project, Devs, and Ops
- Hold ground, keep Prod Up
- Pay down debt
- All Environments Have Same Structure
- Enhance Security so we can support Web
- Measure Everything
- Improve work and progress visibility and documentation.
- Reduce Unplanned Work, and limit planned work to User stories
- When given the choice between two equally valuable outcomes, choose the one that makes future change easier
- All Environments Must Match!
- We ran into a lot of issues when we moved from INT01 (Intake Integration) to PERF (Performance).
- We learned A LOT about Infrastructure as Code!
- Even small teams can benefit from a Scrum Master!
- We started off the team as four engineers, back in November, but over the course of the PI one of us moved into the Service Manager position, and struggled to keep up with planning, working with the project, and coordinating the effort and direction of the team.
- We now have a full time scrum master and service manager, with three engineers. This balance of roles is working much better.