Skip to content

docs(b7): archive b7-6-harness + mark B.7 COMPLETE (9/9)#34

Merged
Bogala merged 1 commit into
mainfrom
docs-b7-complete
Jun 24, 2026
Merged

docs(b7): archive b7-6-harness + mark B.7 COMPLETE (9/9)#34
Bogala merged 1 commit into
mainfrom
docs-b7-complete

Conversation

@Bogala

@Bogala Bogala commented Jun 24, 2026

Copy link
Copy Markdown
Contributor

docs(b7): archive b7-6-harness + mark B.7 COMPLETE (9/9)

Post-merge finalization after the capstone #33 (b7-6 promotion gate) merged to main. Doc-only + spec-consolidation — no code/schema/standard/template change.

What's in it

  • Archive b7-6-harness — appends the FR-B7-6-* / NFR-B7-6-* / ADR-B7-6-* ADDED block to .forge/specs/ai-native-rag.md (prior B.7 blocks preserved); flips its .forge.yaml status: implemented → archived (archived_to + timeline.archived). This is the standard post-merge archive the capstone PR deferred.
  • Doc resyncdocs/new-archetypes-plan.md §0.12 + .forge/product/roadmap.md (T7 row + B.7 row): "4/9 in progress" → "B.7 COMPLETE 9/9"; records all 9 bricks archived + ai-native-rag promoted to stable/scaffoldable:true (2026-06-23, PR feat(b7-6-harness): promote ai-native-rag to stable/scaffoldable (B.7.6 — final B.7 brick) #33). These status sections had been intentionally deferred all chain to avoid merge conflicts.
  • CHANGELOG — the B.7.6 promotion / B.7-complete entry.

Verification

verify.sh 485/0 PASS (b7-6 now archived, .forge.yaml validates, no open questions) · constitution-linter 71/0 OVERALL PASS · validate-foundations PASS (ai-native-rag/1.0.0 stage=stable).

🤖 Generated with Claude Code

https://claude.ai/code/session_01PPnqp5voa9PfC5JJ6HCKQz

Post-merge finalization of the B.7 chain (capstone PR #33 merged to main):

- Archive b7-6-harness: append the FR-B7-6-* / NFR-B7-6-* / ADR-B7-6-* ADDED
  block to .forge/specs/ai-native-rag.md (prior B.7 blocks preserved); flip
  .forge.yaml status implemented→archived (archived_to + timeline.archived).
- Doc resync: docs/new-archetypes-plan.md §0.12 + .forge/product/roadmap.md
  (T7 row + B.7 row) updated from "4/9 in progress" to "B.7 COMPLETE 9/9",
  ai-native-rag promoted to stable/scaffoldable:true 2026-06-23.
- CHANGELOG: add the B.7.6 promotion / B.7-complete entry.

Gates: verify.sh 485/0 PASS (b7-6 archived, schema valid, no open questions) ·
constitution-linter 71/0 OVERALL PASS · validate-foundations PASS
(ai-native-rag/1.0.0 stage=stable). Doc-only + spec-consolidation; no code,
schema, standard, or template change.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PPnqp5voa9PfC5JJ6HCKQz
@Bogala Bogala merged commit 6d291d9 into main Jun 24, 2026
7 checks passed
Bogala added a commit that referenced this pull request Jun 24, 2026
docs(b7): mark B.7 COMPLETE 9/9 in the T7 recap table (missed in #34)
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant