Skip to content

Appeng 5611 Java CCA#285

Open
gnetanel wants to merge 5 commits into
RHEcosystemAppEng:mainfrom
gnetanel:APPENG-5611_Java_CCA
Open

Appeng 5611 Java CCA#285
gnetanel wants to merge 5 commits into
RHEcosystemAppEng:mainfrom
gnetanel:APPENG-5611_Java_CCA

chore: add maven options and go cache path env vars

7c650b0
Select commit
Loading
Failed to load commit list.
exploit-iq-pac / Pipelines as Code CI / vulnerability-analysis-on-pr cancelled Jul 9, 2026 in 3m 34s

Cancelled

Pipelines as Code CI/vulnerability-analysis-on-pr has been cancelled.

Details


Task Statuses:

StatusDurationName
🟢 Succeeded 5 seconds

eval-feature-gate

🟢 Succeeded 24 seconds

fetch-repository

🔴 Failed 3 minutes

lint-and-test


Failure snippet:

task lint-and-test has the status "TaskRunCancelled":
TaskRun "vulnerability-analysis-on-pr-2mgbd-lint-and-test" was cancelled. TaskRun cancelled as the PipelineRun it belongs to has been cancelled.