Skip to content

epsonscan2: 6.7.63.0 -> 6.7.70.0 and migrate to by-name#358303

Closed
james-atkins wants to merge 2 commits into
NixOS:masterfrom
james-atkins:pr/epsonscan2-update
Closed

epsonscan2: 6.7.63.0 -> 6.7.70.0 and migrate to by-name#358303
james-atkins wants to merge 2 commits into
NixOS:masterfrom
james-atkins:pr/epsonscan2-update

Conversation

@james-atkins

@james-atkins james-atkins commented Nov 23, 2024

Copy link
Copy Markdown
Contributor

Updated to 6.7.70.0. Epson doesn't provide changelogs. Fixed broken patch URLs and cleanup warnings.
Migrated to pkgs/by-name.

  • Built on platform(s)
    • x86_64-linux
    • aarch64-linux
    • x86_64-darwin
    • aarch64-darwin
  • For non-Linux: Is sandboxing enabled in nix.conf? (See Nix manual)
    • sandbox = relaxed
    • sandbox = true
  • Tested, as applicable:
  • Tested compilation of all packages that depend on this change using nix-shell -p nixpkgs-review --run "nixpkgs-review rev HEAD". Note: all changes have to be committed, also see nixpkgs-review usage
  • Tested basic functionality of all binary files (usually in ./result/bin/)
  • 25.05 Release Notes (or backporting 24.11 and 25.05 Release notes)
    • (Package updates) Added a release notes entry if the change is major or breaking
    • (Module updates) Added a release notes entry if the change is significant
    • (Module addition) Added a release notes entry if adding a new NixOS module
  • Fits CONTRIBUTING.md.

Add a 👍 reaction to pull requests you find important.

@ofborg ofborg Bot added 11.by: package-maintainer This PR was created by a maintainer of all the package it changes. 10.rebuild-darwin: 0 This PR does not cause any packages to rebuild on Darwin. 10.rebuild-linux: 1-10 This PR causes between 1 and 10 packages to rebuild on Linux. 10.rebuild-linux: 1 This PR causes 1 package to rebuild on Linux. labels Nov 23, 2024
@wegank wegank added the 2.status: merge conflict This PR has merge conflicts with the target branch label Dec 10, 2024
Epson doesn't seem to publish a changelog anywhere.
Remove 32-bit version as it is 2024.
@james-atkins

Copy link
Copy Markdown
Contributor Author

Rebased to fix merge conflict from #322537.

@james-atkins james-atkins removed the 2.status: merge conflict This PR has merge conflicts with the target branch label Dec 11, 2024
@github-actions github-actions Bot removed the 10.rebuild-linux: 1 This PR causes 1 package to rebuild on Linux. label Dec 11, 2024
@Shawn8901

Copy link
Copy Markdown
Contributor

fyi: i cherry-picked this pr into #365687 and added my pr motivation (fix gcc14 builds) on top of it, so that pr is fully superseding this. I hope that this is okay.

@james-atkins

Copy link
Copy Markdown
Contributor Author

That's fine. I'll close this PR.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

10.rebuild-darwin: 0 This PR does not cause any packages to rebuild on Darwin. 10.rebuild-linux: 1-10 This PR causes between 1 and 10 packages to rebuild on Linux. 11.by: package-maintainer This PR was created by a maintainer of all the package it changes.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants