Skip to content

Replace LMS pickoff with beam splitter#340

Draft
oczoske wants to merge 1 commit into
dev_masterfrom
oc/met_lms_pickoff
Draft

Replace LMS pickoff with beam splitter#340
oczoske wants to merge 1 commit into
dev_masterfrom
oc/met_lms_pickoff

Conversation

@oczoske
Copy link
Copy Markdown
Contributor

@oczoske oczoske commented Apr 23, 2026

The LMS pickoff was implemented as a gold-coated mirror (reflection ~98 per cent). At least in parallel mode it is actually a beam splitter with 90 per cent, as required in METIS-3111/METIS-5453. This PR makes that replacement.

Caveat: E-REP-NOVA-MET-1142 (CFO Design and Analysis Report) talks about a wheel with both a mirror (for stand-alone LMS observations) and a beam-splitter (for parallel observations with IMG-LM). It is unclear at the moment whether how this is handled in operations and at AIT.

@oczoske oczoske self-assigned this Apr 23, 2026
@oczoske oczoske added instrument-specific Limited to a certain IRDB instrument package data update New version of or change to a data file METIS METIS AIT Issues related to METIS AIT simulations labels Apr 23, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

data update New version of or change to a data file instrument-specific Limited to a certain IRDB instrument package METIS AIT Issues related to METIS AIT simulations METIS

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant