ci(eval): persist eval reports via auto-merge PR#6
Merged
Conversation
main is protected (requires the test check), so the eval bots could not push reports directly: the run did all the work, then died at GH006 protected-branch-update-failed. Push the generated report to a dated bot/ branch and open a PR that auto-merges once ci.yml passes. Checkout uses RELEASE_PAT rather than GITHUB_TOKEN so the PR actually triggers the test check; PRs opened by GITHUB_TOKEN do not start workflow runs, which would leave the required check pending and auto-merge stuck.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
The weekly and monthly eval jobs generate a report, then push it to main. main is protected (requires the test check), so the bot push is rejected with GH006 after all the compute is done. The monthly job spends real money on vision scoring before hitting this, and the report is then lost with the ephemeral runner.
Change
Replace the direct push to main with a branch-and-PR flow:
Branch protection stays intact: reports still pass through the test gate before landing on main. The smoke path on the monthly workflow continues to skip the PR entirely.
Notes