What
After utility assignment is complete, validate total Kwh/ therms for the gas utilities against EIA sources (861 for electric) not sure for gas. Determine acceptable tolerance to determine if we have properly allocated resstock households to each utility.
Why
How (optional)
Deliverables
- Data loading for relevant EIA data
- Validation script to warn if thresholds are exceeded
- Incorporate validation step into automated utility assignment workflow
What
After utility assignment is complete, validate total Kwh/ therms for the gas utilities against EIA sources (861 for electric) not sure for gas. Determine acceptable tolerance to determine if we have properly allocated resstock households to each utility.
Why
How (optional)
Deliverables