Skip to content

Merge plan-pnode with plan-core? #6

@drew-512

Description

@drew-512

Maybe plan-pnode should merge into plan-core since basically pnode is lockstep with the plan data model (aka plan-core). Since pnode sits between the pdi and and client, pnode is 1:1 and tightly integrated with plan-core.

The con that I see is that plan-core would have a small set of files (formerly this repo) dedicated to building pnode. These files could live in a subdir "pnode" and I'd be ok with that.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions