diff --git a/decisions/northstar/README.md b/decisions/northstar/README.md index f959888..29c795e 100644 --- a/decisions/northstar/README.md +++ b/decisions/northstar/README.md @@ -136,6 +136,17 @@ registry: path: ../fairway/.claude/northstar.md ladders_up_to: l2-ojfbot posture: active + # fieldwork-1: first field engagement (private repo — dossier + delivery workspace; wayfinder + # decisions/wayfinder/texas-rr-engagement.md, ruled at #345 close 2026-08-01). Engagement-scoped + # + ordinal by design: retires at sustainment/exit; engagement #2 mints l1-fieldwork-2. + # Northstar file lands with the repo bootstrap (#349) — absent-checkout WARN until then. + # NUMERIC CURRENTS/TARGETS ARE PROPOSALS (operator to calibrate). + - slug: l1-fieldwork-1 + tier: L1 + app: fieldwork-1 + path: ../fieldwork-1/.claude/northstar.md + ladders_up_to: l2-ojfbot + posture: active # Deferred to a later slice (declared here so lint/standup know the intended shape): # - slug: l2-selfco # tier: L2 diff --git a/decisions/wayfinder/texas-rr-engagement.md b/decisions/wayfinder/texas-rr-engagement.md index ea4f8bc..63ec7e8 100644 --- a/decisions/wayfinder/texas-rr-engagement.md +++ b/decisions/wayfinder/texas-rr-engagement.md @@ -61,13 +61,27 @@ Pre-map rulings (grilled at charting, recorded here — not closed tickets): Closed tickets: -(none — charting session) +- Engagement northstar (#345): `l1-fieldwork-1`, engagement-scoped ordinal (repo `fieldwork-1`, + private; retires at sustainment/exit, engagement #2 mints `l1-fieldwork-2`); 5 properties — + arc traversed / value in the customer's numbers / dossier G1–G6 / playbook shadow / + mechanized-auditable delivery; standard movement contract (`Movement proposal:` lines only, + operator-asserted currents); numerics PROPOSED, operator calibrates — Yuri, 2026-08-01 +- SE-processes elevation: NASA SEH process model (system design top-down, product realization + bottom-up, technical management cross-cutting) applied recursively to the engagement's + self-built components (P5) — refines, does not reverse, the "no literal ISO-15288 client-facing + framing" ruling; the 17-process mapping detail is widened into the Engagement stage-gates + ticket — Yuri, 2026-08-01 (mid-#345 session) +- Re-anchor ruled: this map re-anchors `l2-ojfbot` → `ns:l1-fieldwork-1` at the repo bootstrap + (#349), when the northstar file exists on disk and the anchor resolves — Yuri, 2026-08-01 +- Client-data placement: client-named baselines live in the private engagement repo's northstar + file only; the public registry carries slug/path/anonymous comment; the public map's existing + client intel gets a sanitization pass (new task ticket) — Yuri, 2026-08-01 ## Tickets | Ticket (title, refer-by-name) | Type | Blocked by | Status | |-------------------------------|------|------------|--------| -| Engagement northstar: naming, properties, movement contract (#345) | grilling | — | open | +| Engagement northstar: naming, properties, movement contract (#345) | grilling | — | closed | | Discovery instrument for conversation #1 (#346) | grilling | — | open | | Dossier→presence seam: sanitization gate + permission protocol (#347) | grilling | — | open | | DFW restoration competitor + segment teardown (#348) | research | — | open | @@ -75,11 +89,17 @@ Closed tickets: | Engagement stage-gates + TPM discipline (#350) | grilling | Engagement northstar | open | | Playbook shadow: format, home, capture points (#351) | grilling | Engagement stage-gates | open | | Sustainment + exit boundary (#352) | grilling | Engagement stage-gates | open | +| Public-map client-intel sanitization (#356) | task | — | open | Frontier at charting: Engagement northstar, Discovery instrument, Dossier→presence seam, Competitor teardown. Recommended first work session: **Engagement northstar** (unblocks two) or **Discovery instrument** (gates the first real-world conversation). +Frontier after #345 (2026-08-01): Discovery instrument, Dossier→presence seam, Competitor +teardown, Engagement repo bootstrap (unblocked; repo = `fieldwork-1`), Engagement stage-gates +(unblocked; scope WIDENED to include the SEH 17-process mapping onto self-built components), +Public-map client-intel sanitization. + ## Not yet specified - **Generalized pipeline map / customer #2** — statable only after C1/C2 metrics exist; the scale @@ -88,13 +108,13 @@ Competitor teardown. Recommended first work session: **Engagement northstar** (u - **Commercial model beyond the documentation-rights trade** — whether engagement #2 (or a later phase of #1) is paid, and how that changes the boundary rules. Statable after the first engagement produces measured value. -- **seh-study / SE-competency tie-in** — whether the engagement doubles as the SE learning - vehicle; deliberately not chosen at charting (fleet machinery ruled in, literal SE framing - ruled out). Revisit only if the operator elevates it. - **Sub-network + builder-side data access shape** — what data the 100+ subs and the pilot builder can actually provide; statable after discovery conversation #1. -- **Engagement northstar re-anchor** — once the northstar ticket closes, whether this map - re-anchors from `l2-ojfbot` to the new `l1-*` entry; statable at that close. + +Graduated 2026-08-01 (#345 session): *seh-study / SE-competency tie-in* — operator elevated the +NASA SEH process model for self-built components; entered the northstar as P5, detail mapping +widened into the Engagement stage-gates ticket. *Engagement northstar re-anchor* — ruled yes, +executes at the repo bootstrap. Both recorded under Decisions so far. ## Out of scope