[v1.x] Bind transport sessions to the authenticated principal #4273
pull-request-checks.yml
on: pull_request
Matrix: checks / test
all-green
4s
Annotations
9 errors
|
checks / test (3.10, lowest-direct, ubuntu-latest)
The job has exceeded the maximum execution time of 10m0s
|
|
checks / test (3.10, lowest-direct, ubuntu-latest)
The operation was canceled.
|
|
checks / test (3.13, lowest-direct, ubuntu-latest)
The job has exceeded the maximum execution time of 10m0s
|
|
checks / test (3.13, lowest-direct, ubuntu-latest)
The operation was canceled.
|
|
checks / test (3.11, lowest-direct, ubuntu-latest)
The job has exceeded the maximum execution time of 10m0s
|
|
checks / test (3.11, lowest-direct, ubuntu-latest)
The operation was canceled.
|
|
checks / test (3.12, lowest-direct, ubuntu-latest)
The job has exceeded the maximum execution time of 10m0s
|
|
checks / test (3.12, lowest-direct, ubuntu-latest)
The operation was canceled.
|
|
all-green
Process completed with exit code 1.
|