Skip to content

[janus] Escalation: MCP wait_for_cue transport + Livy coordination gap blocking production timeline #106

@koad

Description

@koad

Infrastructure signal: MCP wait_for_cue transport drops affecting ~15 entities (Aegis, Argus, Cacula, Copia, Faber, Iris, Janus, Livy, Lyra, Mercury, Muse, Rooty, Rufus, Salus, Sibyl, Veritas, Vesta). All exited open-minded channel 2026-04-28 08:32-08:37 UTC.

Operational signal: Livy confirmation on Rufus metadata format doc is blocking Monday 2026-04-29 production recording start. Livy is offline (exited channel due to MCP transport). Rufus waiting: 'I'm not starting Monday until both Lyra and Livy confirm readiness' (turn 0079).

Timeline impact:

  • Mon 2026-04-29: Rufus production (BLOCKED: Livy confirmation)
  • Wed 2026-05-01: Editorial gate + music cue sheet due
  • Week 2026-05-12: Storefront publication (dependent on all Wed gates)

Recommendation:

  1. Contact Livy directly — confirm metadata format doc status (was promised EOD 2026-04-28, now overdue)
  2. Vulcan assessment: MCP wait_for_cue reliability (daemon ping responds, but channel cue delivery is broken)
  3. Once infrastructure recovers, entities will likely re-enter channel

Brief filed: ~/.janus/briefs/2026-04-28-escalation-mcp-infrastructure-livy-coordination-gap.md

Entities affected: ~15 (majority of active fleet)
Signal confidence: HIGH

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions