Skip to content

Baseline comparison to proposed forecasting method #2

Description

@hassony2

Dear authors,

Thank you for contributing this dataset and suite of benchmark tasks !

I wanted to reach out regarding the pressure forecasting task, I implemented the following baseline: for each future time step (13 to 24) I predict at test time the average pressure computed on the train split (split randomly, I can share the exact ids if needed). When I compare the results to the numbers presented in table 5 of your paper, this baseline seems to compare favorably.

I obtain the following results (where in red I display the mean and std from your table 5) and in blue the lower rmse for all time steps for the per-timestep average pressure baseline.

image

I am fairly confident my evaluation code is correct, is this also something you can reproduce on your end ?

All the best,

Yana

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Fields

    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions