● Report Drafting: Start drafting the final report, summarizing the methodology, system
design, model training process, simulation results, and analysis.
● Final System Testing: Conduct one last round of testing to ensure the system works as
expected under various conditions.
● Report Drafting: Start drafting the final report, summarizing the methodology, system
design, model training process, simulation results, and analysis.
● Final System Testing: Conduct one last round of testing to ensure the system works as
expected under various conditions.