> nworkers <- 4
> table(unlist(parallel::mclapply(1:100, FUN=function(i) Sys.getpid(), mc.preschedule=TRUE, mc.cores=nworkers)))
5089 5090 5091 5092
25 25 25 25
> future::plan("multicore", workers=nworkers)
> table(unlist(future.apply::future_lapply(1:100, FUN=function(i) Sys.getpid(), future.scheduling=TRUE)))
5093 5094 5095 5096
25 25 25 25 So, "one-to-one". |
Beta Was this translation helpful? Give feedback.
-
|
In my own application, I'm getting different behavior. Here's a relevant section of code, inside a function that takes a prog <- progressor(along = ppe)
parallelize <- ifelse(any(grepl("mc.", names(list(...))))
, mclapply
, future_lapply)
cpe_parts <- parallelize(ppe, function(ppe_) {
prog()
path_m <- matrix(ppe_, nrow=2, dimnames=list(c("D","T")))
## Let's be sure to skip the stopped paths, tho!
if (any(path_m["D",] <= 0, na.rm=TRUE))
return(list(ppe_))
level <- factor(path_m["D",1:unroll], levels=1:self$max_dose())
tox <- path_m["T",1:unroll]
enr <- cohort_sizes[1:unroll]
n <- as.vector(xtabs(enr ~ level))
x <- as.vector(xtabs(tox ~ level))
paths.(n, x, unroll+1, path_m, cohort_sizes)
}
, ...)
cpe <- do.call(c, cpe_parts)
Here's what happens when I run under each parallelizer: > parallax(C=13, mc.cores=4)
C J elapsed
1 13 11571 3.036
pid cached evals skips calc.ms us/calc
1: 58143 2478 2478 6969 1008 407
2: 58144 1021 1021 3089 430 422
3: 58145 437 437 1099 182 418
4: 58146 365 365 496 153 421
5: 58143 2694 2694 7278 1077 400
6: 58144 1096 1096 3170 459 419
7: 58145 542 542 1159 240 444
8: 58146 407 407 511 169 417
9: 58143 2702 2702 7282 1079 399
10: 58144 1227 1227 3411 524 427
11: 58145 557 557 1165 246 443
12: 58146 426 426 513 177 417
13: 58143 2717 2717 7288 1081 398
14: 58144 1246 1246 3413 533 428
15: 58145 565 565 1169 248 440
16: 58146 429 429 513 178 417
17: 58143 2720 2720 7288 1082 398
18: 58144 1249 1249 3413 534 428
19: 58146 532 532 620 233 439
20: 58143 2739 2739 7290 1092 399
21: 58144 1252 1252 3413 535 428
pid cached evals skips calc.ms us/calc
> parallax(C=13) # with empty ..., will default to future.apply::future_lapply
C J elapsed
1 13 11571 6.385
pid cached evals skips calc.ms us/calc
1: 58147 2478 2478 6969 1052 424
2: 58147 3427 3427 10055 1392 406
3: 58147 3761 3761 11182 1509 401
4: 58147 3996 3996 11733 1603 401
5: 58147 4061 4061 12193 1625 400
6: 58147 4124 4124 12286 1644 398
7: 58147 4187 4187 12388 1664 397
8: 58147 4196 4196 12436 1669 397
9: 58147 4204 4204 12440 1673 397
10: 58147 4299 4299 12717 1708 397
11: 58147 4314 4314 12723 1714 397
12: 58147 4330 4330 12728 1719 396
13: 58147 4330 4330 12749 1719 396
14: 58148 73 73 23 16 219
15: 58148 81 81 27 19 234
16: 58148 84 84 27 20 238
17: 58148 85 85 29 20 235
18: 58148 86 86 31 21 244
19: 58149 157 157 128 68 433
20: 58149 161 161 145 69 428
21: 58149 164 164 145 70 426
pid cached evals skips calc.ms us/calc
> Of course, the progress bars don't work as desired under mclapply; this is what motivated me to investigate the futureverse. |
Beta Was this translation helpful? Give feedback.
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
The relationship between the scheduling described in
parallel::mclapplyand that offuture.apply::future_lapplyisn't entirely clear to me. Do the concepts map 1-to-1, or does the futureverse introduce a higher level of abstraction? How might I replicate themc.preschedule=TRUEbehavior in the futureverse?The
future.schedulingandfuture.chunk.sizeparameters seem not to give me the same level of control over the number of worker threads forked underplan(multicore), nor over the way they are assigned to the jobs.Beta Was this translation helpful? Give feedback.
All reactions