dora-rs/dora is frozen for 1.0 consolidation (2026-04-17 → ~2026-07-31)
The main branch of this repo is under branch protection while the dora-rs/adora → dora-rs/dora consolidation lands as dora 1.0. Non-critical PRs will hold until the freeze lifts at Phase 5c (GA tag).
Critical security patches: ping @heyong4725 directly. We can land CVE-level fixes during the freeze with admin bypass.
Tracking: Consolidation execution epic · Plan document
Expected lift: Phase 5c tag of v1.0.0 (revised to ~2026-07-31 from the prior ~2026-06-01 estimate — consolidation is taking longer than planned; see #1624 draft PR for current status). Updated 2026-06-22.
dora-rs/dora is frozen for 1.0 consolidation (2026-04-17 → ~2026-07-31)
The
mainbranch of this repo is under branch protection while thedora-rs/adora→dora-rs/doraconsolidation lands as dora 1.0. Non-critical PRs will hold until the freeze lifts at Phase 5c (GA tag).Critical security patches: ping @heyong4725 directly. We can land CVE-level fixes during the freeze with admin bypass.
Tracking: Consolidation execution epic · Plan document
Expected lift: Phase 5c tag of
v1.0.0(revised to ~2026-07-31 from the prior ~2026-06-01 estimate — consolidation is taking longer than planned; see #1624 draft PR for current status). Updated 2026-06-22.