Current baseline: commit b8e2ee2 (Batch 14D; 14E pending push). Historical 10E checkpoint content is retained below for traceability.

Batch 14E moderation API implementation plan (2026-07-03)

Docs-only. No API implemented. No backend source changed. No schema implemented. No migration created. No UI implemented. No deploy performed.

Area Status
Moderation API implementation plan moderation-api-implementation-plan.md
Moderation API implementation Not started
Main CI Green on b8e2ee2 (run 28673047004)
Pages deploy Green on b8e2ee2
Live Gate 11 / 12 BLOCKED-LIVE
--apply / production import Blocked
Recommended next execution batch 14F — moderation frontend implementation plan (docs-only)

See moderation-api-implementation-plan.md.

Batch 14D moderation schema decision record (2026-07-03)

Docs-only. No schema implemented. No migration created. No API implemented. No UI implemented. No backend behavior changed. No deploy performed.

Area Status
Moderation schema decision record moderation-schema-decision-record.md
Schema / migration implementation Not started
Main CI Green on ae6897f (run 28672126699)
Pages deploy Green on ae6897f
Live Gate 11 / 12 BLOCKED-LIVE
--apply / production import Blocked
Recommended next execution batch 14E — moderation API implementation plan (docs-only)

See moderation-schema-decision-record.md.

Batch 14C moderation UI wireframe spec (2026-07-03)

Docs-only. No UI implemented. No API implemented. No backend behavior changed. No deploy performed.

Area Status
Moderation UI wireframe spec moderation-ui-wireframe-spec.md
Moderation UI implementation Not started
Main CI Green on a74603c (run 28670393922)
Pages deploy Green on a74603c
Live Gate 11 / 12 BLOCKED-LIVE
--apply / production import Blocked
Recommended next execution batch 14D — moderation schema decision record (docs-only)

See moderation-ui-wireframe-spec.md.

Batch 14B moderation API contract review (2026-07-03)

Docs-only. No API implemented. No backend behavior changed. No UI implemented. No deploy performed.

Area Status
Moderation API contract review moderation-api-contract-review.md
Moderation API implementation Not started
Main CI Green on 7087897 (run 28669761127)
Pages deploy Green on 7087897
Live Gate 11 / 12 BLOCKED-LIVE
--apply / production import Blocked
Recommended next execution batch 14C — moderation UI wireframe/spec (docs-only)

See moderation-api-contract-review.md and moderation-ui-scope.md.

Batch 13E moderation UI scoping (2026-07-03)

Docs-only. No UI implemented. No backend behavior changed. No deploy performed.

Area Status
Moderation UI scope doc moderation-ui-scope.md
Moderation UI implementation Not started
PR #9 (URL validation tests) Merged at 837175d
Main CI Green (run 28668960634)
Pages deploy Green after Batch 13I rerun
Live Gate 11 / 12 BLOCKED-LIVE
--apply / production import Blocked
Recommended next execution batch 14B — moderation API contract review (docs-only)

See moderation-ui-scope.md and post-launch-roadmap.md.

Batch 13D Render deployment plan (2026-07-02)

Docs-only. No deploy performed. No Render resources created.

Area Status
Render deployment plan render-deployment-plan.md
Render staging/production resources Not created
Live Gate 11 / 12 BLOCKED-LIVE
--apply / production import Blocked
Recommended next execution batch 13E — moderation UI scoping or repository security settings plan

Deploy implementation (14A) requires separate maintainer approval.

Batch 13C hosting readiness spike (2026-07-02)

Docs-only. No deploy performed.

Area Status
Hosting spike doc hosting-readiness-spike.md
Recommended MVP platform Render (conditional: Fly.io for control, Railway for fast staging)
Full app hosting Local Docker only
Live Gate 11 / 12 BLOCKED-LIVE
--apply / production import Blocked
Recommended next execution batch 13D — Render deployment plan (docs-only) or moderation UI scoping

See hosting-readiness-spike.md.

Batch 13B planning realignment (2026-07-02)

Docs-only checkpoint. Aligns planning docs with Batch 12 closed for MVP readiness under amended Section 18.

Area Status
Live public MVP Healthy
Batch 12 (MVP readiness) Closed — Section 18 offline gate ACCEPTED-MVP (12S)
Offline Gate 11 / 12 ACCEPTED-MVP
Live Gate 11 / 12 BLOCKED-LIVE
--apply implementation Not implemented — blocked
Production import automation Not enabled
Full app hosting Local Docker only
Recommended next execution batch 13C — public backend hosting spike (docs-only)

Live Sheet proof and --apply remain explicitly out of scope until separate maintainer decisions.

See post-launch-roadmap.md post–Batch-12 queue and implementation-status.md Batch 13B.

Batch 12S Section 18 MVP amendment (2026-07-02)

Docs-only maintainer decision. Does not claim live Google Sheet proof passed.

Area Status
Live public MVP Healthy
Batch 12A dry-run CLI Shipped
Batch 12B apply-mode design Shipped
--apply implementation Not implemented — blocked; requires separate maintainer approval
Offline post-upload artifact verify (Batch 12F-P) PASS — processed=2, would_import=1, skipped=1
Offline Gate 11 (MVP) ACCEPTED-MVP (maintainer decision Batch 12S)
Offline Gate 12 (MVP) ACCEPTED-MVP (maintainer decision Batch 12S)
Live Google Sheet export verify Blocked — operational blocker; proof deferred
Live Gate 11 BLOCKED-LIVE
Live Gate 12 BLOCKED-LIVE
Section 18 MVP readiness (offline gate) Amended and accepted
Section 18 live sign-off Not ready — live export proof still required for production automation
Issue #6 Open — tracks apply implementation

SECTION 18 AMENDED FOR MVP: Offline importer gate accepted. Live Google Sheet export proof deferred. Live proof remains required before production automation or --apply mode. MVP readiness may proceed under amended offline gate language only.

Do not implement --apply until explicitly approved in a later maintainer decision. Live export proof remains required before production Sheet import automation.

See implementation-status.md Batch 12G, Batch 12F-P, and Batch 12S.

Batch 12F-P / 12Q status update (2026-07-02)

Docs-only checkpoint after Batch 12F-P offline artifact verification. OFFLINE-PASS only. Not final Section 18 sign-off.

Area Status
Live public MVP Healthy
Batch 12A dry-run CLI Shipped
Batch 12B apply-mode design Shipped
--apply implementation Not implemented — blocked on sheet-import-apply-design.md section 18
Offline post-upload artifact verify (Batch 12F-P) PASS — processed=2, would_import=1, skipped=1
Offline artifact Gate 11 READY
Offline artifact Gate 12 READY
Live Google Sheet export verify Blocked — no live post-upload CSV from the live Sheet
Live Gate 11 BLOCKED-LIVE
Live Gate 12 BLOCKED-LIVE
Final Section 18 live sign-off Not ready
Issue #6 Open — tracks apply implementation

Batch 12F-P verified a generated offline post-upload CSV (20 headers, row 3 imports, stale row 2 skips on review_status). This confirms the importer accepts the expected post-upload structure and moderation values. It is not live Google Sheet proof.

Google live Sheet automation remains blocked (grid editing, bound Apps Script, standalone Apps Script paste/run, clasp wrong account, Sheets API unavailable, Drive export not found). Prior Batch 12F-K fallback artifact also passed verification (processed=1, would_import=1, skipped=0).

Do not implement --apply until a real live Sheet export passes all Section 18 live gates or Section 18 is explicitly amended by maintainer decision.

See implementation-status.md Batch 12G and Batch 12F-P for full details.

Batch 12C status update (2026-07-01)

This report is a historical 10E checkpoint. Current state on main:

Area Status
Live public MVP Healthy
Batch 12A dry-run CLI Shipped
Batch 12B apply-mode design Shipped
--apply implementation Not implemented — blocked on sheet-import-apply-design.md section 18
Live Google Sheet CSV export verify Maintainer required before apply mode
Issue #6 Open — tracks apply implementation

See implementation-status.md for current batch history.

Executive summary (historical — Batch 10E at 3b76e34)

Superseded. For current state see Batch 13B and Batch 12S sections above.

Area Status
Live public MVP Healthy
Documentation chain (Form -> SOP -> import design) Aligned in repo
Live Google Sheet columns Maintainer verify required (not accessible from repo)
Batch 12A import CLI Shipped (dry-run only)
Batch 12B apply design Shipped (docs only)
--apply implementation Blocked — section 18 gates pending
Recommended next batch 12B impl after gate approval, or Issue #1 / #4 hygiene

Planning docs are complete through import design. Implementation should wait for maintainer sign-off on sheet-import-design.md approval checklist and optional Sheet column audit.

Repo checkpoint

Item Value
HEAD 3b76e34e66db96a9344bced55d234f93e0b29cf2
Message docs(batch-10d): design Sheet import pipeline
Branch main aligned with origin/main
Working tree Clean
CI (latest) success — run 28552106629
Pages success — built

Live site verification

Check Result
https://codethor0.github.io/ghost-sweep/ HTTP 200
Form URL https://forms.gle/PsjaYrbrCjAgZXjW8 2 occurrences
Forbidden phrases (blocked, placeholder, localhost, Batch 6C) Absent
Root mirror vs public-mvp/index.html Match

Live site is consistent with documented public MVP state.

Issue tracker review

Six issues open: #1, #4, #5, #6, #7, #8.

Issue #1 — Contributor onboarding: job URL validation pipeline

Field Assessment
State Keep OPEN
Rationale Reframed good-first lane; Batch 6D foundation shipped
Scope remaining Extend offline tests/docs; no API wiring
Blocks 12A? No

Recommendation: Keep open as contributor entry point. Optional: remove stale batch-6e label in favor of good first issue only.

Issue #4 — Dependency hardening: deferred npm and pip advisories

Field Assessment
State Eligible to close (maintainer decision)
Rationale Batch 7E classified remaining findings as accepted deferred or local-environment noise per dependency-audit.md
Scope remaining Periodic re-audit when dependencies change
Blocks 12A? No

Recommendation: Close with comment linking Batch 7E section, or rename to "Periodic dependency re-audit" and remove blocked:external. Do not claim zero advisories exist — accepted risk is documented.

Issue #5 — Design review: future URL validation API integration

Field Assessment
State Keep OPEN
Rationale Design gate before API wiring, Sheet import validation policy, and extension handoff
Scope remaining Answer where validation runs (import vs report create vs moderation)
Blocks 12A? Soft block — import design references offline validation only; 12A can proceed without #5 if scope stays offline

Recommendation: Keep open. Resolve before Batch 11B (URL validation API wiring). Optional: narrow 12A to offline validation only (already in design).

Issue #6 — Plan: Google Sheet to backend import pipeline

Field Assessment
State Keep OPEN (design phase complete)
Rationale Batch 10D delivered sheet-import-design.md; comment at 3b76e34
Scope remaining Batch 12A CLI implementation
Blocks 12A? N/A — this issue tracks the pipeline

Recommendation: Keep open until 12A ships. Update labels: consider removing blocked:needs-design (design done); add note that implementation is blocked on maintainer approval checklist.

Issue #7 — Form/Sheet moderation workflow and future product UI

Field Assessment
State Keep OPEN (operational SOP complete)
Rationale Batch 10C delivered moderation-sop.md
Scope remaining Product moderation UI, Sheet-to-backend bridge UI
Blocks 12A? No — SOP is sufficient for manual review

Recommendation: Keep open for product UI milestones. Optional: edit issue body to mark deliverables 1--2 complete and link SOP; leave deliverable 3 (product UI) open.

Issue #8 — Extension API wiring plan

Field Assessment
State Keep OPEN
Rationale No design doc yet (Track 3 deliverables pending)
Scope remaining Extension handoff UX plan
Blocks 12A? No

Recommendation: Keep open. Schedule design batch (10F or parallel to 11A) before extension network calls.

Close summary

Issue Recommendation
#1 Keep open
#4 Close or reframe (maintainer approval)
#5 Keep open
#6 Keep open (design done)
#7 Keep open (SOP done; UI deferred)
#8 Keep open

Google Sheet column alignment

Repo docs define expected columns. The live Sheet was not inspected in this checkpoint (maintainer-only access). Manual verification required.

Form columns (from google-form-intake-spec.md)

Timestamp, Job posting URL, Company name, Job title, Location or remote, Date seen, Why do you suspect..., Has the company responded?, Consent, Evidence links (optional), Optional contact email (optional).

Maintainer columns (from moderation-sop.md)

Column Referenced in import design
review_status Yes — eligibility gate
reviewer Yes — audit metadata
reviewed_at Yes — audit metadata
decline_reason_code Yes — must be empty for import
duplicate_of Yes — must be empty for import
notes Yes — audit only
pii_redacted Yes — must be yes
import_ready Yes — must be yes
escalation_level Yes — must be none/empty

Maintainer action item

Open the project Google Sheet and confirm:

  1. All nine maintainer column headers exist with exact names (case-sensitive).
  2. Data validation or dropdowns match SOP allowed values where practical.
  3. At least one test row exercises approved_for_import + import_ready=yes for future dry-run testing.
  4. Optional contact email column is not referenced in any import-ready test row metadata exports.

Gap: post-launch-roadmap.md Track 1 still mentions only review_status, reviewer, notes in one line — superseded by moderation SOP (cosmetic doc drift).

Documentation chain

google-form-intake-spec.md  -->  Form fields
moderation-sop.md           -->  Review columns + import_ready gates
sheet-import-design.md      -->  Backend mapping + 12A prerequisites
post-launch-roadmap.md      -->  Batch sequence
implementation-status.md    -->  Batch history

Cross-links verified in repo. No contradictions found on import eligibility rules.

Batch 12A prerequisites

From sheet-import-design.md maintainer approval checklist:

Prerequisite Status
Field mapping approved Pending maintainer
pending vs verified on import policy approved Pending maintainer
Description format approved Pending maintainer
Idempotency strategy (audit-only v1) approved Pending maintainer
Dry-run default approved Pending maintainer
PostingSource mapping v1 approved Pending maintainer
Schema change needs identified Documented as optional future tables; v1 uses audit_logs only
Live Sheet columns match SOP Pending maintainer verify
Local Docker stack validated Available (existing gates)
Issue #5 URL validation API design Not required if 12A stays offline-only per design

Verdict: Batch 12A dry-run CLI is available. --apply mode (Batch 12B) requires maintainer checklist sign-off and live Sheet column verification via scripts/verify_sheet_columns.py.

Recommended batch sequence (reset — historical)

Superseded by post-launch-roadmap.md post–Batch-12 queue. Next execution batch: 13C (hosted backend readiness spike, docs-only).

Doc vs live MVP drift check

Doc claim Live verification
Public MVP live at codethor0.github.io/ghost-sweep Confirmed HTTP 200
Form URL PsjaYrbrCjAgZXjW8 Confirmed 2x in HTML
Full app local Docker only N/A (not on Pages)
Next.js 16.2.9 in README Not on public MVP (static HTML only)
Integrity scoring planned, not public Live copy matches post-10B softening

No blocking doc/live drift detected on public surfaces.

Validation (read-only)

Public MVP validator run at checkpoint: PASS (no repo changes).