Skip to content

fix(remote-connect): sync connected network tab (#1718) #3549

fix(remote-connect): sync connected network tab (#1718)

fix(remote-connect): sync connected network tab (#1718) #3549

Triggered via push July 23, 2026 10:35
Status Cancelled
Total duration 3m 12s
Artifacts

ci.yml

on: push
CLI Tests (ubuntu-latest)
2m 56s
CLI Tests (ubuntu-latest)
Matrix: rust-build-check
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Frontend Build
Canceling since a higher priority waiting request for ci-refs/heads/main exists
Frontend Build
The operation was canceled.
CLI Tests (ubuntu-latest)
Canceling since a higher priority waiting request for ci-refs/heads/main exists
CLI Tests (ubuntu-latest)
The operation was canceled.
CI
Canceling since a higher priority waiting request for ci-refs/heads/main exists