List of all the items need to be completed to begin TKR reconstruction... ## Required - #168 - #180 - IF board mounting to foam - Modify TKR frame and re-fabricate - Install RAD by lifting with crane (most likely stick with forklift install) - Implement edge paddle mounts - #191 - #190 - Install UMB panels - Install TOF UMB RATs - Implement full TOF UMB cable routing ## Highly desired, but "undesired-able" workarounds exist - Update TOF UMB mounts - Install TKR cable relief solution - Re-enforce RAD mounts (??) - Antenna solution, if it requires re-fab of frame members (??) - #187 ## Optional - #107 - #150 - New LV/HVPS (??)
List of all the items need to be completed to begin TKR reconstruction...
Required
Highly desired, but "undesired-able" workarounds exist
Optional